St. Francis of Assisi School

01603 419857

Gas Safe Registration 22889

Replacement of Boiler Plant and associated Controls system and Builders work

Project Description

  • Strip out existing plant, associated controls, wiring and pipework.
  • Strip out existing boiler flues.
  • Install new gas fired boiler plant and flues.
  • Install new pumps, heating pressurisation unit, expansion vessels and
  • pipework.
  • Provide new control panel.
  • Create new storage area.
  • Carry out all necessary builders work in connection with the new installation.
  • Carry out electrical wiring and earth bonding.
  • Provide new lighting

Project Included

  • Supply and installation of Hamworthy Purewell Variheat PV gas fired condensing boilers and Mikrofill pressurisation unit, Grundfos pumps and Mikrofill pressuristation unit. 
  • The installation of a Hamworthy Dorchester DR-TC60 solar water heater complete with unvented kit.
  • A Roof mounted Trigon 2.3V 10 Solar panel array was installed on the flat roof above the Boiler Plant Room.
  • Supply and installation of a complete new controls system and associated equipment.
  • Builders work included remodelling of the existing Boiler Room to provide dediciated storage area.

Contract Value: circa £120,000

Project Team:

Client: St. Francos of Assisi Catholic Primary School

Mechanical Services Consultant: NPS Property Consultants Ltd